Realized project of a multi-family residential building and additional development, Sofia, KV "Manastirski livadi zapad", 39 "Maistor Alexi Rilets" street, 5 floors with a built-up area of 1,216 square meters - "STROY N" EOOD is the main contractor with technical leader - the Manager, Nikolay Kamenov.
The construction site was opened at the end of 2019, SMP includes all specialties, such as rough construction, thermal insulation system on facades with EPS 10 cm and finishing silicone plaster "Licata", flat roof construction with steam, warm (XPS 15 cm) and hydro insulation with TPO membrane 1.8 mm, "Renolit Belgium", pitched roof with reinforced concrete for slope, anchored wooden structure, heat-insulating stone wool, sheathing with chipboard boards, paradrainage geotextile and PVC stitched membrane with ribs "Renolit".
Oral drainage. Novi Vic, Electrical, HVAC and gas installations.
Most properties have integrated underfloor heating. The common areas are filled with natural granite on steps and landings.
Safety railing is made of stainless steel.
The joinery is with a five and six-chamber "AluPlast" profile, the double-glazed windows are with three and two chambers, according to the specific assignments of the owners and the Investor.
The implemented vertical layout has a uni-pavement at the approaches of the building and implemented landscaping, according to project documentation. Some apartments have a "smart" system with recuperators for environmentally friendly ventilation of the premises.
The installed access control is with a video or audio intercom system of "Bticino" to each property, according to the assignment of the project.







































